bannerprojects

The Cruz de Plata Project


map 04 s
COMMODITY:
Gold, Silver
LOCATION:
Durango, Mexico
SIZE:
22.9 km²
 

The Cruz de Plata Project includes an oxide gold prospect (referred to as El Capitan) and two historic silver mines (Jesus Maria and San Rafael) located in the historic Peñoles Mining District of Durango, Mexico. the Cruz de Plata Project is host to multiple mineralized vein systems, fault zone structures, poly-metallic skarns, and silicified low-temperature gold-rich volcaniclastics. Approximately 86 diamond drill holes totalling more than 11,550 metres have now been completed at the Project. Drilling to date on the Peñoles property has defined wide intervals of near-surface gold mineralization (with low silver values) at El Capitan that could potentially be amenable to open-pit extraction methods and significant intervals of near-surface silver mineralization (with associated gold, lead and zinc values) at Jesus Maria zone.

According to published historic records, Minera Industrias Peñoles was incorporated in 1887 to operate the Jesus Maria and San Rafael silver mines and took its name from the local community of Peñoles. The full extent of the historic mine workings is unknown, but mining appears to have been selective and limited to within approximately 100 metres from the surface. The only modern exploration work that was completed on the property prior to 2011 consisted of a four-hole drill program completed by Aurcana Corporation (“Aurcana”) in 2004, and surface mapping, sampling, a limited IP survey, and a five-hole drill program completed by Riverside in 2008 and 2009. The drill holes completed by Aurcana and Riverside returned encouraging results and showed that El Capitan had potential to host a bulk-tonnage, low-grade gold deposit. Preliminary metallurgical tests completed by Sierra Madre in 2011 using Riverside drill core indicated that the gold mineralization at El Capitan could likely be recovered using cyanide leaching. Since March 2011, exploration work and drilling funded by Riverside’s partner has primarily focused on the El Capitan Gold Zone and the Jesus Maria Silver Zone.

The Cruz de Plata Project has an established (305k oz Au at 0.46 g/t & 15M oz Ag at 62 g/t Ag) inferred resource (see NI 43-101 report below), which remains open in multiple directions and at depth.  Previous work includes drilling, underground sampling and trenching at the El Capitan gold zone and the historic Jesus Maria silver mine discovered high-grade Ag

El Capitan Gold Zone

  • DH 12-13: 124.3m at 0.61 g/t Au
  • DH 11-03: 105.25m at 0.58 g/t Au

Jesus Maria Zone (Silver & Gold)

  • JM DDH 12-10: 4.25m at 732.24 g/t Ag & 1.2 g/t Au
  • JM DDH 14-24: 41.95m at 227.24 g/t Ag including 7.15m at 988.4 g/t Ag & 1.24 g/t Au
  • JM DDH 14-27: 18.7m at 203.92 g/t Ag & 0.65 g/t Au

The Peñoles property lies in the Altiplano Sub province of the Sierra Madre Occidental (SMO). The SMO is a regionally extensive Eocene to Miocene volcanic field that extends from the US-Mexican border into Central Mexico. The Altiplano sub province is on the eastern flank of the SMO and comprises Jurassic to late Tertiary sedimentary and volcanic rocks (Sedlock et al., 1993). This district hosts extensive hydrothermal-related silver, gold and base-metal deposits and is generally referred to as the Faja de Plata, or Mexican Silver Belt.

The El Capitan deposit, the Jesus Maria deposit, and the San Rafael-El Tubo prospects of the Peñoles Project are located on the concessions owned by Riverside and they appear to be related to intersections between the northwest-striking and northeast-striking regional structures. These occurrences are also localized along the southern margins of a northeast-oriented magnetic anomaly identified from government airborne surveys.

NI 43-101 Technical Report

During the 2011 and 2012 campaign at El Capitan drilling encountered numerous intervals of gold mineralization ranging from 50 m to 140 m in length. Mineralization appears localized along the unconformity between Tertiary-age volcaniclastic rocks and Cretaceous-age sediments. The upper part of the mineralized zone consists of porous, volcanic agglomerate cut by narrow quartz veinlets and hydrothermal breccias (averaging 0.2 g/t to 0.5 g/t Au). At the base of the volcanic unit, there is a shallow-dipping, 10 m to 35 m wide silicified zone (averaging 0.7 g/t to 1.5 g/t Au), and, below this zone, there is a sequence of oxidized shales that is also cut by quartz veinlets and hydrothermal breccias (averaging 0.2 g/t to 0.6 g/t Au) with low silver values.

The Jesus Maria prospect was initially considered to be a relatively narrow but high-grade vein-type target; however, drilling carried out in 2013 and 2014 encountered 20 m to 80 m wide intervals of predominantly silver-rich mineralization (with accessory gold and base-metal values). Based on the widths of mineralization, the Jesus Maria might be amenable to open-pit extraction methods. At their eastern limits, the deposits are separated by approximately 300 m; however, the mineralized zones are interpreted as merging to the west. Additional drilling between the western limit of the Jesus Maria deposit and the El Capitan deposit could connect the two zones and delineate additional mineralization.

The Mineral Resource statement for the El Capitan and Jesus Maria deposits is shown in Table 1.1; the resources are not constrained within pit shells but include mineralization, above cut-off, that is within a maximum depth of 150 m below surface. There are no adjustments for recovery or dilution in the statement of mineral resources. It is important to note that these are estimates of mineral resources, not mineral reserves, as the economic viability has not been demonstrated.

Table 1.1: Inferred Mineral Resource Estimate

DepositktonnesGold (g/t)Silver (g/t)Contained Gold (koz)Contained Silver (koz)
El Capitan 20,722 0.458 2.8 305 1,832
Jesus Maria 7,573 0.105 62.3 26 15,158
Combined 28,295 0.364 18.7 331 16,990

To date 86 holes have been drilled in the property.

drill hole penoles s

 

November 2020 - The first seven drill holes from the current and on-going 6,000 metre reverse circulation (RC) drill program at the Cruz de Plata Project is complete. This initial drill campaign is focused on testing the continuity of known gold-silver zones at the Capitan Hill Deposit, both along strike and down-dip of the March 2015, 43-101 compliant, inferred resource outline, as well as infill significant gaps within the resource model. The first seven drill holes of the program are presented herein, all of which intersected Capitan Hill style mineralization that is consistent in grade and width with previous drilling.

Spring-Summer 2021 exploration program

Capitan completed its initial 6,000-metre drill program in early 2021 and began a second stage of drilling in the spring that will continue through the summer working on expanding mineralization in the Capitan gold zone. The Company expects to drill approximately 6,000 metres of reverse-circulation drilling during this period as well as to continue surface exploration work on additional targets within the Cruz de Plata Project in order to advance them towards a drill stage. 

 

Picture1

 2020-2021 Peñoles Project Drill Program

 

New Mineralized Zones: Gully Fault and JM North

Surface work programs including mechanical trenching and prospecting were conducted at the Cruz de Plata Project in Q4 2021. The focus of this work has been on identifying new targets at the Gully Fault and JM North areas (see figure below)

The Gully Fault had previously been identified through drilling and topographic analysis, as a steeply dipping, northeast trending fault, that is interpreted to exert a strong influence on the distribution and deposition of higher-grade Au-Ag mineralization at both the Capitan Hill gold deposit and Jesus Maria silver deposit. Until recently, little effort had been made to locate its surface expression, as well as to pursue it as a stand-alone exploration target. Trenching at the Gully Fault target has shown that the structure is prospective for Capitan Style mineralization, with sampling returning 54m of 0.14 g/t Au and 11.6m of 0.21 g/t Au. At present the Gully Fault target has been exposed over a strike length of approximately 150m and remains open to the northeast, beyond the Jesus Maria deposit.

Prospecting was also conducted north of the Jesus Maria silver deposit, to follow-up on anomalous soil samples, that were collected in the spring of 2021. Numerous grab and chip samples were collected from mineralized outcrop exposures over this area with several returning significant, high-grade Ag-Au and accessory base metal mineralization. The best values include 0.6m of 410 g/t Ag, 0.9 g/t Au, 1.67% Pb and 0.7% Zn and 0.9m of 183 g/t Ag, 2.13 g/t Au, 2.9% Pb and 0.76% Zn. These new zones are located between 40m and 140m north of the Jesus Maria deposit.

Compilation and interpretation of lithology and structural data indicate that this new zone of mineralization follows a similar trend as the JM silver deposit to the south and is now referred to as the JM North target. Follow-up prospecting and trenching is scheduled to begin on this target within the next few weeks, to gather more information on its attitude and the extent of its surface expression.

Picture1

Figure: Locations of New Targets, Deposits and Significant results at the Cruz de Plata Project

Summary of Phase 2 Program

The 2021 Phase 2 drill program was focused on testing and expanding the continuity of oxide gold mineralization at the Capitan Hill deposit, to better define the boundaries of both the Capitan Main Zone, and the more poorly defined Hanging Wall Zone. 

Step-out drilling during the 2021 Phase 2 program, has significantly expanded the footprint of both the Hanging Wall and Capitan Main zone compared to the 2020 envelope (See 3D Figures below).  Additionally, infill drilling has helped to define higher-grade shoots within the lower grade envelope in the central and western portions of the deposit.

The Phase 2 program totals include 6,036m of drilling completed in 21 RC drillholes, bringing the total amount of drilling by Capitan to 12,208m.  Drilling continues at Capitan’s Penoles project and management will provide guidance in a separate press release in the coming week.

thumbnail PastedGraphic 1 jan27 1

Figure: Expansion of mineralization at the Capitan Hill oxide-gold deposit (3D View)

thumbnail PastedGraphic 2jan21 2

Figure: Expansion of mineralization at the Capitan Hill oxide-gold deposit (3D View)

Expansion Drilling, Capitan Main Zone

RC holes 20-CARC-01, 03, and 05 located on sections 100, 400, and 250 respectively, tested the continuity of the gold-silver mineralization down dip of the 2015 Inferred Resource.

All of the RC drill holes above successfully intersected the Capitan Hill Main Zone, with results being consistent with the grade and width of the previous drilling. These new holes extended the Capitan Hill Main gold-silver mineralization down-dip between 50 to 120 m. Drill results include 76.2 m of 0.41 g/t gold in hole 20-CARC-05, 68.58 m of 0.4 g/t gold in hole 20-CARC-03 and 51 m of 0.439 g/t gold in hole 20-CARC-01. Click here for link to cross-sections.

RC Hole 20-CARC-01, located on section 100, collared near the eastern edge of the Capitan Hill Main Zone. The hole was mineralized through its entire length starting from surface and was ended in mineralization. This hole extended the Capitan Hill Main Zone by 120 m down dip from previous drilling. 

In addition to intersecting the Capitan Hill Main Zone, RC holes 20-CARC-05 and 20-CARC-03, also cut significant values of silver mineralization, expanding the continuity of silver mineralization at depth. Silver values in RC hole 20-CARC-05 include 60.96 m of 25.15 g/t silver that includes a higher-grade zone of 33.5 m of 33.67 g/t silver. 

All of the expansion holes were oxidized through their entire length, with RC holes 20-CARC-01 and 03 getting into sulphide mineralization at drill hole depths of 173.7 m and 184.4 m respectively. 

Infill Drilling, Capitan Main Zone

Infill drilling in the current program was designed to confirm the presence of the Capitan Hill Main zone in areas where significant gaps (75-100 m ) existed in the 2015 Inferred Resource model. All holes presented below successfully confirmed the presence of the Capitan Hill Main Zone. 

RC hole 20-CARC-06 was drilled on section 250 and was designed to test a roughly 100-metre wide gap between previously drilled diamond drill holes CDDH-12-10 and CDDH-08-02. Hole 20-CARC-06 intersected the main Capitan Hill Zone from 35.1 m to 146 m, with a total drilled width of 111.25 m grading 0.342 g/t gold, including 45.7 m of 0.626 g/t gold. (See Drill Table below

RC Hole 20-CARC-07 was drilled on section 300, between previously drilled diamond drill holes CDDH-08-05 and CDDH-12-12 to infill a large >100 m wide gap. The hole cut the main mineralized zone in three, narrowly separated, intercepts that are bound by anomalous gold mineralization. These include 22.9 m of 0.2 g/t gold, 35.1 m of 0.27 g/t gold and 50.3 m of 0.22 g/t gold. The hole bottomed in anomalous mineralization and could not be drilled to its completed depth due to technical issues. 

RC Hole 20-CARC-02 was drilled on section 000 and designed to test a >100 m wide gap between CDDH-12-17 and surface. The hole successfully intersected the Capitan Hill Main Zone and confirmed its presence up-dip, to surface, and was mineralized almost over its entire length. Significant values include 0.284 g/t gold over 29 m and 56.4 m of 0.398 g/t gold.

New, Near Surface Hanging Wall Gold Zones

Drilling prior to the March 2015 resource statement at Capitan Hill indicated the possibility of additional zones of oxidized, gold-silver mineralization located in the hanging wall to the Capitan Hill Main Zone. However, due to a lack of drilling, the significance of these zones was poorly understood and precluded from being captured in the March 2015 resource estimate. 

In the current program, RC holes 20-CARC-03, 05 and 07 confirmed the presence and continuity of these "Hanging Wall Zones", highlighting the potential to enhance the existing resource. The most significant results include 30.5 m of 0.22 g/t gold starting from surface in RC hole 20-CARC-03; 22.9 m of 0.199 g/t gold in RC hole 20-CARC-07, and 35.05 m of 0.15 g/t gold in RC hole 20-CARC-05.

Drill Results Discussion

Drill hole 20-CARC-12 was a step-out hole designed to test the down-dip extension of the main Capitan Hill Zone, as well as test for Hanging Wall mineralization, which was absent in hole CDDH-11-06 located immediately up-dip. The hole was successful in confirming the presence of up to five, > 10 m wide, mineralized zones in the Hanging Wall, starting from surface, with the best interval returning 22.9 m of 0.20 g/t gold, which has extended the zone down-plunge 100 m to the south-east from section 200 (see Figure 2).

Additionally, hole 20-CARC-12 successfully intersected the main Capitan Hill zone as expected, reporting an interval of 73.2 m grading 0.63g/t Aueq including a higher grade interval of 36.6 m of 0.91 g/t Aueq in oxides, which indicates a new higher grade block which may be developing in this area. This new interval extended the main Capitan Hill Zone down-dip approximately 65 m from hole CDDH-11-06. 

Hole 20-CARC-09 was an infill hole that was designed to test a gap between two historic drillholes, both of which were terminated in the Capitan Main zone. The hole successfully confirmed the presence of the Capitan Hill Zone, as well as extending the zone approximately 12.5 m to depth, compared to where the historic holes had ended, reporting an interval of 64 m grading 0.69 g/t Aueq, with a higher grade interval of 13.5 m grading 1.26 g/t Aueq. The hole also intersected the Hanging Wall zone between 25 to 65 m, but only sporadic, low grade values were returned.

Hole 20-CARC-08 was designed to test an approximate 100 m wide gap in the Capitan Main zone between surface and historic hole CDDH-12-15. The hole was successful in intersecting the up-dip projection of the Capitan main zone, returning an interval of 48.8 m grading 0.58 g/t Aueq.

Note: All intervals reported above are oxidized with the exception of a 12.2 m wide sulfide intercept in the Capitan Hill zone starting from 179.8 m depth.  

Table 1. Table of drill results

 
Hole Name Azimuth Dip Section Zone From (m) To (m) Interval (m) AuEq_ppm (80:1) Au (ppm) Ag (ppm) OX-SUL
20-CARC-01                      
Interval 28 70 100 Capitan Main 0 10.7 10.7 0.11 0.11 NSV OX
Interval       Capitan Main 22.9 41.1 18.3 0.12 0.12 NSV OX
Interval       Capitan Main 45.7 64 18.3 0.2 0.2 NSV OX
Interval       Capitan Main 70.1 97.5 27.4 0.25 0.25 NSV OX
Interval       Capitan Main 100.6 115.8 15.2 0.14 0.14 NSV OX
Interval       Capitan Main 121.9 173.7 51.8 0.46 0.44 1.64 OX
Including       Capitan Main 135.6 173.7 38.1 0.57 0.55 2.01 OX
Interval       Capitan Main 173.7 201.2 27.4 0.31 0.28 2.13 SUL
20-CARC-02                      
Interval 28 40 0 Capitan Main 0 42.7 42.7 0.25 0.25 NSV OX
Interval       Capitan Main 50.3 79.2 29 0.28 0.28 NSV OX
Interval       Capitan Main 83.8 140.2 56.4 0.41 0.4 0.81 OX
Including       Capitan Main 112.8 138.7 25.9 0.55 0.53 1.56 OX
Interval       Capitan Main 144.8 160 15.2 0.3 0.28 1.62 OX
20-CARC-03                      
Interval 28 50 400 Hanging Wall 0 30.5 30.5 0.22 0.22 NSV OX
Interval       Hanging Wall 59.4 67.1 7.6 0.12 0.12 NSV OX
Interval       Hanging Wall 77.7 83.8 6.1 0.12 0.12 NSV OX
Interval       Hanging Wall 97.5 102.1 4.6 0.15 0.14 0.93 OX
Interval       Capitan Main 115.8 184.4 68.6 0.54 0.4 11.01 OX
Including       Capitan Main 117.3 134.1 16.8 0.94 0.74 15.88 OX
Interval       Capitan Main 184.4 189 4.6 0.18 0.14 3.73 SUL
Interval       Capitan Main 202.7 207.3 4.6 0.13 0.11 1.57 SUL
20-CARC-04                      
Interval 28 60 400 Hanging Wall 0 10.7 10.7 0.14 0.13 0.3 OX
Interval       Capitan Main 16.8 22.9 6.1 0.16 0.16 0.31 OX
Interval       Capitan Main 30.5 68.6 38.1 0.36 0.34 1.78 OX
20-CARC-05                      
Interval 0 90 250 Hanging Wall 0 3 3 0.13 0.13 NSV OX
Interval       Hanging Wall 15.2 18.3 3 0.13 0.13 NSV OX
Interval       Hanging Wall 47.2 82.3 35.1 0.15 0.15 NSV OX
Interval       Capitan Main 135.6 138.7 3 0.26 0.25 0.73 OX
Interval       Capitan Main 149.4 225.6 76.2 0.68 0.41 21.02 OX
Including       Capitan Main 167.6 184.4 16.8 1.04 0.68 28.49 OX
20-CARC-06                      
Interval 28 70 250 Hanging Wall 18.3 29 10.7 0.24 0.24 NSV OX
Interval       Capitan Main 35.1 146.3 111.3 0.36 0.34 1.69 OX
Including       Capitan Main 89.9 135.6 45.7 0.66 0.63 2.88 OX
20-CARC-07                      
Interval 208 75 300 Hanging Wall 6.1 33.5 27.4 0.11 0.11 NSV OX
Interval       Hanging Wall 67.1 70.1 3 0.19 0.19 NSV OX
Interval       Capitan Main 91.4 114.3 22.9 0.22 0.2 1.35 OX
Interval       Capitan Main 120.4 155.4 35.1 0.33 0.27 5.2 OX
Interval       Capitan Main 160 210.3 50.3 0.28 0.22 4.83 OX
20-CARC-08                      
Interval 28 60 300 Capitan Main 29 77.7 48.8 0.58 0.57 1.03 OX
including       Capitan Main 47.2 76.2 29 0.82 0.8 1.44 OX
20-CARC-09                      
Interval 28 60 450 Capitan Main 79.2 143.3 64 0.69 0.58 9.37 OX
including       Capitan Main 94.5 138.7 44.2 0.86 0.72 10.81 OX
add including       Capitan Main 118.9 132.6 13.7 1.26 1.04 18.24 OX
20-CARC-10                      
Interval 28 70 0 Hanging Wall 36.6 100.6 64 0.27 0.26 0.39 OX
Interval       Hanging Wall 105.2 150.9 45.7 0.31 0.3 0.61 OX
including       Hanging Wall 144.8 149.4 4.6 1.41 1.39 1.7 OX
Interval       Capitan Main 166.1 213.4 47.2 0.24 0.2 2.62  
including       Capitan Main 166.1 181.4 15.2 0.19 0.17 0.89 OX
and including       Capitan Main 181.4 213.4 32 0.26 0.22 3.44 SUL
20-CARC-11                      
Interval 28 50 100 Hanging Wall 53.3 64 10.7 0.17 0.17 NSV OX
Interval       Hanging Wall 73.2 102.1 29 0.15 0.15 NSV OX
Interval       Hanging Wall 112.8 125 12.2 0.18 0.18 NSV OX
Interval       Hanging Wall 135.6 147.8 12.2 0.21 0.21 NSV OX
Interval       Hanging Wall 163.1 172.2 9.1 0.34 0.34 NSV OX
Interval       Capitan Main 192 249.9 57.9 0.94 0.88 4.15  
including       Capitan Main 192 231.6 39.6 1.21 1.15 4.38 OX
and including       Capitan Main 196.6 225.6 29 1.54 1.48 4.96 OX
and including       Capitan Main 196.6 214.9 18.3 2.04 1.99 4.12 OX
and including       Capitan Main 231.6 249.9 18.3 0.35 0.31 3.67 SUL
20-CARC-012                      
Interval 28 80 150 Hanging Wall 0 13.7 13.7 0.12 0.12 NSV** OX
Interval       Hanging Wall 21.3 33.5 12.2 0.15 0.15 NSV OX
Interval       Hanging Wall 39.6 50.3 10.7 0.11 0.11 NSV OX
Interval       Hanging Wall 65.5 77.7 12.2 0.2 0.2 NSV OX
Interval       Hanging Wall 83.8 106.7 22.9 0.2 0.2 NSV OX
Interval       Capitan Main 143.3 216.4 73.2 0.63 0.55 6.53  
Including       Capitan Main 143.3 179.8 36.6 0.91 0.83 6.65 OX
and including       Capitan Main 179.8 192 12.2 0.45 0.4 3.78 SUL
and including       Capitan Main 192 216.4 24.4 0.3 0.2 7.74 OX
20-CARC-13                      
Interval 360 90 500 Capitan Main 85.3 185.9 100.6 0.42 0.32 8.15  
including       Capitan Main 131.1 152.4 21.3 0.67 0.52 11.67 OX
and including       Capitan Main 182.9 185.9 3 0.23 0.17 4.7 SUL
20-CARC-14                      
Interval 15 60 -100 Hanging Wall 30.5 50.3 19.8 0.13 0.13 NSV OX
Interval       Capitan Main 94.5 120.4 25.9 0.36 0.31 4.41  
including       Capitan Main 108.2 120.4 12.2 0.48 0.36 8.84 SUL
20-CARC-15                      
Interval 28 65 -300 Hanging Wall 21.3 29 7.6 0.16 0.16 NSV OX
Interval       Hanging Wall 50.3 61 10.7 0.18 0.18 NSV OX
Interval       Hanging Wall 108.2 121.9 13.7 0.19 0.19 NSV OX
Interval       Hanging Wall 128 166.1 38.1 0.18 0.18 NSV OX
Interval       Capitan Main 204.2 221 16.8 0.24 0.22 1.83 OX
20-CARC-16                      
Interval 28 70 150 Hanging Wall 68.6 120.4 51.8 0.18 0.18 NSV OX
Interval       Capitan Main 185.9 249.9 64 0.59 0.5 7.12 OX
including       Capitan Main 201.2 227.1 25.9 0.87 0.77 8.22 OX
and including       Capitan Main 208.8 222.5 13.7 1.02 0.93 6.83 OX
and including       Capitan Main 233.2 245.4 12.2 0.66 0.51 11.64 OX
20-CARC-17                      
Interval 28 50 000 Hanging Wall 42.7 64 21.3 0.25 0.25 NSV OX
Interval       Hanging Wall 68.6 83.8 15.2 0.25 0.25 NSV OX
Interval       Hanging Wall 93 135.6 42.7 0.17 0.17 NSV OX
Interval       Hanging Wall 173.7 208.8 35.1 0.33 0.31 1.43 OX
Interval       Capitan Main 213.4 248.4 35.1 0.26 0.21 3.99 SUL
21-CARC-18                      
Interval 28 65 200 Hanging Wall 15.2 27.4 12.2 0.22 0.22 NSV OX
Interval       Hanging Wall 48.8 74.7 25.9 0.17 0.17 NSV OX
Interval       Hanging Wall 82.3 102.1 19.8 0.3 0.3 NSV OX
21-CARC-19                      
Interval 28 65 -550 Capitan Main 129.5 163.1 33.5 0.4 0.32 6.1 OX
21-CARC-20                      
Interval 28 55 -650 Hanging Wall 39.6 57.9 18.3 0.14 0.14 NSV OX
Interval       Capitan Main 109.7 126.5 16.8 0.26 0.24 1.22 OX
21-CARC-21                      
Interval 28 60 400 Hanging Wall 56.4 77.7 21.3 0.19 0.19 NSV OX
Interval       Hanging Wall 117.3 123.4 6.1 0.21 0.21 NSV OX
Interval       Hanging Wall 141.7 152.4 10.7 0.16 0.16 NSV OX
21-CARC-22                      
Interval 23 50 500 Hanging Wall 89.9 103.6 13.7 0.14 0.14 NSV OX
Interval       Hanging Wall 108.2 123.4 15.2 0.12 0.12 NSV OX
Interval       Hanging Wall 138.7 147.8 9.1 0.11 0.11 NSV OX
21-CARC-23                      
Interval 28 60 -50 Hanging Wall 41.1 47.2 6.1 0.26 0.26 NSV OX
Interval       Hanging Wall 51.8 65.5 13.7 0.29 0.29 NSV OX
Interval       Hanging Wall 68.6 85.3 16.8 0.13 0.13 NSV OX
Interval       Hanging Wall 89.9 128 38.1 0.16 0.16 NSV OX
21-CARC-24                      
Interval 28 50 -400 Hanging Wall 10.7 25.9 15.2 0.16 0.16 NSV OX
Interval       Capitan Main 182.9 225.6 42.7 0.34 0.23 8.82 OX
including       Capitan Main 196.6 207.3 10.7 0.56 0.41 12.01 OX
21-CARC-25                      
Interval 28 50 100 Hanging Wall 36.6 54.9 18.3 0.14 0.14 NSV OX
Interval       Hanging Wall 59.4 65.5 6.1 0.14 0.14 NSV OX
Interval       Hanging Wall 82.3 94.5 12.2 0.21 0.21 NSV OX
Interval       Hanging Wall 141.7 167.6 25.9 0.19 0.19 NSV OX
Interval       Capitan Main 204.2 234.7 30.5 0.24 0.21 1.93  
including       Capitan Main 227.1 234.7 7.6 0.22 0.17 3.9 SUL
21-CARC-26                      
Interval 28 63 -250 Hanging Wall 7.6 118.9 111.3 0.17 0.16 0.25 OX
Interval       Hanging Wall 125 149.4 24.4 0.15 0.14 0.58 OX
Interval       Hanging Wall 157 170.7 13.7 0.17 0.14 2.38 OX
Interval       Hanging Wall 187.5 196.6 9.1 0.3 0.28 1.77 OX
Interval       Capitan Main 208.8 242.3 33.5 0.37 0.2 14.25  
including       Capitan Main 225.6 242.3 16.8 0.37 0.17 15.66 MIX
21-CARC-27                      
Interval 360 90 000 Hanging Wall 35.1 68.6 33.5 0.2 0.2 NSV OX
Interval       Hanging Wall 91.4 118.9 27.4 0.18 0.18 NSV OX
Interval       Hanging Wall 129.5 175.3 45.7 0.21 0.21 NSV OX
Interval       Capitan Main 195.1 213.4 18.3 0.19 0.19 0.51 OX
Interval       Capitan Main 224 262.1 38.1 0.17 0.17 0.69 OX
Interval       Capitan Main 271.3 289.6 18.3 0.23 0.21 1.34 SUL
21-CARC-28                      
Interval 28 75 300 Hanging Wall 76.2 86.9 10.7 0.13 0.13 NSV OX
Interval       Hanging Wall 137.2 182.9 45.7 0.15 0.15 NSV OX
Interval       Hanging Wall 208.8 217.9 9.1 0.17 0.17 0.34 OX
21-CARC-30                      
Interval 360 90 -550 Capitan Main 132.6 138.7 6.1 0.34 0.28 5.1 OX
Interval       Capitan Main 182.9 192 9.1 0.2 0.15 4.35 MIX
Interval       Capitan Main 198.1 204.2 6.1 0.16 0.14 1.95 MIX
Interval       Capitan Main 216.4 227.1 10.7 0.15 0.11 3.3 MIX
Interval       Capitan Main 234.7 243.8 9.1 0.21 0.15 5.02 SUL
21-CARC-31                      
Interval 360 90 -100 Hanging Wall 76.2 102.1 25.9 0.2 0.2 NSV OX
Interval       Capitan Main 109.7 297.2 187.5 0.24 0.23 1.23 MIX
including       Capitan Main 236.2 265.2 29 0.55 0.51 2.78 OX
including       Capitan Main 278.9 297.2 18.3 0.2 0.18 1.62 SUL
21-CARC-32                      
Interval 28 50 -450 Hanging Wall 137.2 143.3 6.1 0.28 0.26 1.39 OX
Interval       Hanging Wall 189 199.6 10.7 0.3 0.25 3.81 OX
Interval       Capitan Main 225.6 266.7 41.1 0.31 0.24 5.39 OX
21-CARC-33                      
Interval 28 60 -200 Hanging Wall 79.2 117.3 38.1 0.26 0.26 NSV OX
Interval       Capitan Main 163.1 219.5 56.4 0.75 0.58 13.78 OX
including       Capitan Main 179.8 190.5 10.7 1.19 0.99 16.07 OX
21-CARC-34                      
Interval 28 50 750 -- 6.1 12.2 6.1 0.15 0.15 NSV OX
21-CARC-35                      
Interval 28 75 500 Hanging Wall 117.3 131.1 13.7 0.34 0.32 1.62 OX
Interval       Capitan Main 138.7 182.9 44.2 0.17 0.13 3.41 OX
Interval       Capitan Main 199.6 205.7 6.1 0.18 0.12 4.73 SUL
21-CARC-36                      
Interval 28 80 150 Hanging Wall 21.3 32 10.7 0.12 0.12 NSV OX
Interval       Hanging Wall 42.7 70.1 27.4 0.23 0.23 NSV OX
Interval       Capitan Main 103.6 166.1 62.5 0.43 0.38 3.6 OX
including       Capitan Main 118.9 128 9.1 0.95 0.91 2.95 OX
21-CARC-37                      
Interval 28 60 -50 Hanging Wall 41.1 76.2 35.1 0.14 0.14 NSV OX
Interval       Hanging Wall 93 114.3 21.3 0.19 0.19 NSV OX
Interval       Hanging Wall 125 143.3 18.3 0.15 0.15 NSV OX
Interval       Capitan Main 173.7 190.5 16.8 0.13 0.12 0.97 OX
Interval       Capitan Main 211.8 217.9 6.1 0.3 0.29 1.45 OX
Interval       Capitan Main 245.4 254.5 9.1 0.2 0.15 3.72 SUL
Interval       Capitan Main 265.2 278.9 13.7 0.39 0.34 4.37 SUL
21-CARC-38                      
Interval 360 90 250 Hanging Wall 19.8 105.2 85.3 0.16 0.16 NSV OX
Interval       Capitan Main 213.4 221 7.6 0.2 0.19 0.74 OX
Interval       Capitan Main 249.9 263.7 13.7 0.15 0.13 1 OX
Interval       Capitan Main 272.8 292.6 19.8 0.2 0.15 3.77 OX
21-CARC-39 28 70° 50                
Interval       Hanging Wall 35.1 44.2 9.1 0.15 0.15 NSV OX
Interval       Hanging Wall 48.8 61 12.2 0.33 0.33 NSV OX
Interval       Hanging Wall 67.1 134.1 67.1 0.15 0.15 NSV OX
Interval       Hanging Wall 192 199.6 7.6 0.17 0.17 NSV OX
Interval       Capitan Main 221 275.8 54.9 0.26 0.21 4.09 MIX 
including       Capitan Main 221 254.5 33.5 0.26 0.23 2.26 OX
including       Capitan Main 254.5 275.8 21.3 0.27 0.18 6.96 SUL
Interval       Capitan Main 286.5 292.6 6.1 0.15 0.12 2.95 SUL
21-CARC-40 28 87° 250                
Interval       Hanging Wall 47.2 76.2 29 0.2 0.2 NSV OX
Interval       Hanging Wall 79.2 89.9 10.7 0.2 0.2 NSV OX
Interval       Hanging Wall 121.9 137.2 15.2 0.3 0.3 NSV OX
including       Hanging Wall 128 129.5 1.5 1.44 1.44 NSV OX
Interval       Capitan Main 176.8 253 76.2 0.4 0.32 7.04 OX
including       Capitan Main 189 207.3 18.3 0.7 0.59 8.47 OX
including       Capitan Main 237.7 239.3 1.5 1.33 1.2 10.5 OX
21-CARC-41 68 60° 400                
Interval       Hanging Wall 13.7 29 15.2 0.16 0.16 NSV OX
Interval       Hanging Wall 56.4 62.5 6.1 0.2 0.2 NSV OX
Interval       Hanging Wall 74.7 82.3 7.6 0.1 0.1 NSV OX
Interval       Hanging Wall 143.3 161.5 18.3 0.35 0.33 1.83 OX
Interval       Capitan Main 182.9 190.5 7.6 0.2 0.16 3.2 OX
Interval       Capitan Main 205.7 237.7 32 0.32 0.23 7.3 OX
21-CARC-42 28 50° -350                
Interval       Capitan Main 29 61 32 0.24 0.24 NSV OX
Interval       Capitan Main 67.1 83.8 16.8 0.2 0.2 NSV OX
Interval       -- 185.9 192 6.1 0.32 0.06 21.13 SUL
21-CARC-43 360 90° -200                 
Interval       Capitan Main 105.2 134.1 29 0.14 0.14 NSV OX
Interval       Capitan Main 169.2 213.4 44.2 0.19 0.19 NSV OX
21-CARC-44                      
Interval 28 65 100 Capitan Main 79.2 82.3 3 0.11 0.11 NSV OX
21-CARC-45                      
Interval 28 55 350 Hanging Wall 7.6 21.3 13.7 0.14 0.14 NSV OX
Interval       Hanging Wall 25.9 44.2 18.3 0.17 0.17 NSV OX
Interval       Capitan Main 114.3 144.8 30.5 0.22 0.18 2.73 OX
Interval       Capitan Main 155.4 199.6 44.2 0.28 0.21 5.79 MIX
21-CARC-46                      
Interval 28 60 -250 Hanging Wall 0 13.7 13.7 0.16 0.16 NSV OX
Interval       Hanging Wall 19.8 22.9 3 0.11 0.11 NSV OX
21-CARC-47                      
Interval 28 65 200 Capitan Main 236.2 239.3 3 0.25 0.24 1.15 OX
Interval       Capitan Main 254.5 271.3 16.8 0.28 0.25 2.46 OX
21-CARC-48                      
Interval 28 65 -100 Hanging Wall 38.1 44.2 6.1 0.13 0.13 NSV OX
Interval       Hanging Wall 48.8 54.9 6.1 0.12 0.12 NSV OX
Interval       Hanging Wall 97.5 105.2 7.6 0.12 0.12 NSV OX
Interval       Capitan Main 157 160 3 0.12 0.12 NSV OX
Interval       Capitan Main 169.2 173.7 4.6 0.19 0.19 NSV OX
Interval       Capitan Main 198.1 202.7 4.6 0.12 0.12 NSV OX
Interval       Capitan Main 211.8 228.6 16.8 0.17 0.17 NSV OX
Interval       Capitan Main 249.9 266.7 16.8 0.19 0.16 2.04 OX
Interval       Capitan Main 280.4 315.5 35.1 0.42 0.39 2.58 MIX
including       Capitan Main 288 292.6 4.6 1.1 1.08 1.83 OX
including       Capitan Main 297.2 301.8 4.6 0.72 0.7 1.9 OX
21-CARC-49                      
Interval 28 65 0 Hanging Wall 42.7 45.7 3 0.29 0.29 NSV OX
21-CARC-29                      
Interval 28 85 -50 Main + HW 56.4 251.5 195.1 0.34 0.31 2.14 MIX
including       Capitan Main 56.4 205.7 149.4 0.37 0.35 1.24 OX
And incl.       Capitan Main 137.2 175.3 38.1 0.63 0.61 1.9 OX
And incl.       Capitan Main 144.8 155.4 10.7 0.95 0.92 2.2 OX
including       Capitan Main 205.7 251.5 45.7 0.25 0.19 5.04 SUL
Interval       JM Ag ext 292.6 300.2 7.6 0.77 0.14 50.6 SUL
including       JM Ag ext 292.6 295.7 3 1.54 0.26 103 SUL

Table 2: Trench and Grab Sample Highlights from The Gully Fault and JM North Targets

ID Type Zone Width (m) Ag (g/t) Au (g/t) Pb (%) Zn (%)
69098 Chip JM North 0.9 183 2.13 2.9 0.8
69091 Chip JM North 0.6 410 0.9 1.7 0.7
69102 Chip JM North 0.6 414 0.54 2.4 0.4
69163-69192 Trench Gully Fault 54 - 0.14 - -
69050-69054 Trench Gully Fault 11.6 - 0.21 - -
69067-69073 Trench Gully Fault 5.7 - 0.35 - -

Note: Trench samples were collected as 1m chips along  the trench wall. Chip sample width was limited by outcrop exposure. True widths of the zones above are unknown at this time

Capitan Mining has entered into a purchase agreement to acquire all outstanding net smelter royalties (NSR's) on mining claims in the Cruz de Plata Project from Exploraciones del Altiplano, a private Mexican exploration company. The royalties covered a number of targets including the current gold-silver resource areas of Capitan and Jesús María. This included a 2% NSR on the Capitan Hill claims, 0.75% on claims covering the Jesús María, San Rafael, Pinchazo and Capitan 2 targets and 0.5% on third-party claims surrounding these targets. The total consideration for the transaction is US$1.0M, which will be paid 50% in cash and 50% in Capitan shares over a staged 2-year payment schedule. Capitan will also retain a right of first refusal (ROFR) on any shares distributed to Altiplano as consideration for the royalty purchase; allowing the company the opportunity to place Altiplano’s shares, upon written notice from Altiplano of their intentions to sell.

In addition to the royalties held by Altiplano, the Cruz de Plata Project has a 1% royalty owned by Riverside Resources which was created as part of the asset spinout in 2020. Capitan has the contractual option to purchase and retire the Riverside royalty for C$250,000 at any time.

The scientific and technical data contained in this news release pertaining to the Cruz de Plata Project was reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Mining, who is responsible for ensuring that the technical information provided in this news release is accurate and who acts as a “qualified person” under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

Capitan Mining Inc. has a Quality Assurance/Quality Control program that includes insertion and verification of control samples including standard reference material, blanks and duplicates consistent with industry standards.

Picture1  
Picture2 
Picture1
Figure 2: Cross Section showing hole 21-CARC-29 in relation to Jesús María silver deposit
 
 
 
2021 DRILL PROGRAM FIGURES